Skip to content

Advisors Reports

Contact Us

Advisors Reports

  • Home
  • Distribution
  • Power Minister, Adelabu’s 6,000MW power target uncertain as August output slips to 5,517MW

Recent Posts

  • Hello world!
  • Dangote refinery raises petrol gantry price to N799, as MRS retail pump price increases to N839 per litre
  • National grid collapses again, DisCos record zero supply nationwide
  • Jake Riley, NCDMB empower 250 youths in Lagos with skills, starter packs across seven vocational sectors
  • REA, Lotus Bank partner to establish standalone DARES financing facility for solar energy developers

Recent Comments

  1. KAZ of KazMPIRE on Hello world!

Archives

  • February 2026
  • January 2026
  • December 2025
  • November 2025
  • October 2025
  • September 2025
  • August 2025
  • July 2025
  • June 2025
  • May 2025
  • April 2025
  • March 2025
  • January 2025
  • December 2024
  • November 2024
  • October 2024
  • September 2024
  • August 2024
  • July 2024
  • June 2024
  • May 2024
  • April 2024
  • March 2024
  • February 2024

Categories

  • Advertorial
  • Concession
  • Distribution
  • Documentary
  • Downstream
  • Editorial
  • Energy Transition
  • Environment
  • Extractive Industry
  • Feature
  • Finance
  • Gas
  • Generation
  • Green Finance
  • Hospitality
  • Hydrogen
  • Hydroplant
  • Impact
  • Interview
  • Local Content
  • Maritime
  • Midstream
  • Mining
  • Mining & Solid Mineral
  • Multilateral Finance
  • News
  • Nuclear
  • Oil
  • Oil & Gas
  • Oil theft
  • Opinion-editorial
  • Photo News
  • Power
  • Renewables
  • Review
  • Sabotage
  • Security
  • Service Company
  • Solar
  • Special Project
  • Special Report
  • Sustainability
  • Technology
  • Transmission
  • Uncategorized
  • Upstream
September 18, 2025DistributionEnergy TransitionGenerationPower

Power Minister, Adelabu’s 6,000MW power target uncertain as August output slips to 5,517MW

… three power plants — Alaoji 1, Ibom, Rivers 1 — record zero supply in August

Oredola Adeola

With just four months left until the December 31, 2025, deadline set by the Minister of Power, Chief Adebayo Adelabu, for the country to achieve 6,000MW of generation and transmission, the latest figures suggest the target remains uncertain.

Data from the Nigerian Electricity Regulatory Commission (NERC) show that out of 28 grid-connected power plants with a combined installed capacity of 13,625 megawatts (MW), an average of 5,517MW was available in August 2025, slightly down from 5,577MW recorded in July.

Meanwhile, out of the 28 grid connected plants, three — Alaoji 1 (500MW), Ibom Power (190MW), and Rivers 1 (180MW) — failed to supply any electricity to the grid during the review period.

This is according to data obtained by Advisors Reports from the Nigerian Electricity Regulatory Commission’s (NERC) Power Plants Operational Performance Factsheet.

The available 5,517MW translates to a Plant Availability Factor (PAF) of 40 percent for grid-connected plants, representing the capacity actually dispatched onto the grid.

On the other hand, plant utilisation and output data showed that average hourly generation in August stood at 4,106MWh/h, representing about 74 percent of available capacity.

This was lower than the 4,340MWh/h recorded in July, when utilisation was at 78 percent.

During the period under review, the top ten largest energy producers accounted for 79 percent of the total electricity generated in the month, according to NERC data.

Egbin 1 led the pack with an output of 690MW out of its 1,320MW installed capacity, achieving a load factor of 640MWh/h, which translates to 93 percent utilisation.

It was followed by Delta 1, which generated 507MW or 56 percent of its 900MW installed capacity, translating to a load factor of 429MWh/h (85 percent).

Kainji supplied 397MW out of its 760MW capacity, representing 52 percent output, but with a load factor of 374MWh/h (94 percent).

Zungeru 1, with an installed capacity of 700MW, generated 681MW (97 percent), though its load factor stood at 292MWh/h (43 percent).

Afam 2 supplied 203MW to the grid, representing 31 percent of its 650MW installed capacity, yet recorded a strong load factor of 196MWh/h (97 percent).

Shiroro generated 435MW out of 600MW capacity, about 73 percent, with a load factor of 259MWh/h (60 percent).

Similarly, Jebba 1 supplied 472MW from a capacity of 578MW (82 percent), recording a load factor of 344MWh/h (73 percent).

Okpai 1 delivered 319MW out of 480MW (66 percent), achieving a load factor of 249MWh/h (78 percent).

Ihovbor 2 supplied 332MW of its 461MW capacity, translating to 72 percent output and a load factor of 302MWh/h (91 percent).

Geregu 1, with an installed capacity of 435MW, generated 235MW (54 percent) and recorded a load factor of 167MWh/h (71 percent).

The GenCos had earlier missed the December 31, 2024, deadline set by the Minister to generate 6,000MW, and uncertainty remains over whether this could repeat, despite Adelabu’s confidence that Nigeria is on course to deliver at least 8,000MW before the end of President Tinubu’s first term in 2027.

Notably, under Tinubu’s administration, generation capacity has already increased by 1,700MW in two years, rising from 4,100MW in Q3 2023.

MIDSTREAM WAR: DAPPMAN accuses Dangote of $40/mt discount to foreign traders, refinery counters with ₦1.5trn subsidy demand claim

Previous post

NLNG wins OGTAN’s best Corporate Training Partner award 2025

Next post

Leave a Reply Cancel Reply

Your email address will not be published. Required fields are marked *

© 2024 - 2025 | Alrights reserved